The past summer was a thrilling time for our David Douglas District as we have embarked on a series of improvement projects made possible by the incredible support of our community through the Bond Measure approved in 2022!
We cannot thank you enough for believing in these initiatives that not only enhance our schools but also play a crucial role in ensuring the safety of our children and staff.
We are pleased to share some vibrant photos showcasing the amazing projects that have been completed over the summer.
For more information, we invite you to visit our Bond webpage, where you can find comprehensive details about each completed project as well as those planned for future completion.
Let’s continue this journey together!
Floyd Light Middle School
- Remodeled entry for a secure vestibule
- Installed generator and service lines
- Updated building HVAC system
Before and After Photos




Fir Ridge Campus
- Remodeled entry and a secure vestibule
- Replaced roofing
After Photos


Mill Park Elementary School
- Updates to the office in the safety vestibule
- Remodeled existing areas to include spaces for specialists
- Replaced most windows
- Replaced a portion of the roof
- Seismic upgrade
Before and After Photos


West Powellhurst Elementary School
- Upgraded the HVAC system
- Remodeled existing areas to include spaces for specialists
- Remodeled entry for a secure vestibule
- Replaced the fire alarm system
Before and After Photos


South Powellhurst
- Replaced the tile flooring
- Replaced the fire alarm system
- Upgraded HVAC system
Construction Photo

David Douglas High School – South Building
- Remodeled main entry area (safety vestibule)
- Replaced the fire alarm system
- Replaced part of the roof on the south campus and part of the Performing Arts Center (PAC)
- Replaced the damaged roof structure
- Replaced lighting for football and baseball fields
After Photo

David Douglas High School – North Building
- Replaced the North Gym bleachers
- Replaced the drive system on the North Gym bleachers
After Photo

David Douglas High School – Aquatics Center
- Replaced 5 tier bleachers
After Photo

The Career and Technical Education (CTE) Center
- On budget and on schedule
- Status: to be substantially completed by December 2025
November 2024

Latest Photos







Visit our Bond Measure Update webpage, which outlines the timeline for each project and has the most up-to-date information.
For answers to common questions about the Bond Measure, please check our Frequently Asked Question (FAQ) page, which also includes a form where you can submit additional questions.